BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 1 OF 8
www.emseal.com
PRODUCT/INSTALL
D
A
T
A
BG SYSTEM
Expansion joint installation in below grade formed floors and walls
Product Description
The BG System is a heavy-duty, double-celled, ex-
truded, double level, thermoplastic rubber gland flanked
by integral side flashing sheets.
The system consists of:
1) Thermoplastic (heat-weldable) BG sealing insert
and side flashing sheets
2) Termination bar and anchors
The above components are combined in the field with
a waterproofing membrane and accessories offered by
the waterproofing membrane manufacturer for use in
blind forming conditions.
The waterproofing membrane is installed on the mud-
slab or lagging in accordance with the waterproofing
membrane manufacturer's instructions.
The BG SYSTEM sealing gland is positioned over water-
proofing membrane at the centerline location of the
structural expansion joint.
The underside of the BG SYSTEM side flashing sheets
are adhered to the installed waterproofing membrane
using an adhesive mastic provided by the waterproof-
ing membrane manufacturer as tested and approved
for this purpose.
Another layer of the adhesive mastic is applied over the
top of the BG SYSTEM side flashing sheets to a width
which is wider by at least two inches than the BG
SYSTEM side flashing sheets.
Another full width layer of waterproofing is firmly, and
without any voids, adhered into the adhesive mastic
thereby completing a sandwich of the BG SYSTEM side
flashing sheets and the waterproofing membrane and
adhesive mastic.
• The BG SYSTEM termination bar and anchors are in-
stalled to hold the system in place prior to pouring
concrete.
The concrete is poured over the waterproofing mem-
brane and BG SYSTEM sandwich.
The net result is the integration of the below-grade
waterproofing membrane and expansion joint system
on the exterior of the wall or floor while ensuring that
movement at the joint-gap is properly accommodated.
Uses, Applications
For use at structural expansion joints in foundation and
tunnel floor and wall slabs where access to the exterior
is not possible after casting.
Suitable for installation where access to the exterior
of walls is impossibleafter concrete placed:
1--lagging or single-side forming conditions
2--across the underside of foundation and tunnel slabs.
IMPORTANT:
The BG System is, in concept, a solution to the difficult
problem of sealing expansion joints on the exterior of
blind-side formed foundation conditions created through the
choice or need to cast concrete against lagging rather than
casting freestanding foundation walls.
The specification of the BG SYSTEM is made as a
consequence of the designer’s recognition of the merits of
the principle of the BG SYSTEM solution. Likewise
specification of the BG SYSTEM is made with the designer’s
and owner’s understanding of the need for proper installation
and control and protection of the system throughout the
construction process.
EMSEAL assumes no responsibility and supplies no warranty
for the workmanship of the contractors involved in any part
of site preparation and/or installation of the BG SYSTEM, or
for the finishing of any part of the related work on any
project.
The BG SYSTEM will not perform in conditions that are
unsuitable to the requirements for performance of the
waterproofing membrane materials into which the BG
SYSTEM is integrated (consult the waterproofing membrane
manufacturer).
Ultimately, because the BG SYSTEM is heavily
dependent on proper workmanship during
installation, and protection after it is installed and
before and during concrete placement,
EMSEAL offers a standard warranty only.
Note: BG System includes necessary termination
bar and fasteners required for installation.
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 2 OF 8
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
1) On the underside of the floor-slab (on top of a mud
slab) of a foundation or tunnel with freestanding
walls
2) Under the floor-slab AND on the walls of a blind-
side formed (lagging retaining system) foundation
or tunnel.
3) On the walls only of a blind-side formed (lagging
retaining system) foundation (no joint in floor slab).
IMPORTANT:
The BG SYSTEM with this installation is not for use on
freestanding walls where access to the wall is available.
For these conditions install BG with positive-side
installation instructions.
IMPORTANT:
The BG SYSTEM will not perform its intended function if
installed on rough and irregular surfaces. Substrates simi-
lar to rock, earth, chain-link retaining mesh, etc. that are
not lagging ARE NOT acceptable substrates for the BG
SYSTEM. In addition, the use of drainage board as a
means to smooth irregular surfaces is not acceptable. If
drainage board is specified, the substrate that will sup-
port the drainage board must be smooth, lagged walls.
SUMMARY:
There are several basic principles that apply throughout
the use of the BG SYSTEM.
1) The waterproofing membrane shall have been
determined by the manufacturer of the
membrane to be compatible with and have a
proven method by which to adhere positively
www.emseal.com
Warranty:
EMSEAL Joint Systems, Ltd. warrants the BG SYSTEM
to be free of defects in workmanship-in-manufacture
and materials only at the time of shipment from our
factory. If any BG SYSTEM materials are proven to
contain manufacturing defects that substantially affect
their performance, EMSEAL will, at its option, replace
the materials or refund its purchase price.
This limited warranty is the only warranty extended
by EMSEAL with respect to the BG SYSTEM. There are
no other warranties, including the implied warranties
of merchantability or fitness for a particular purpose.
EMSEAL specifically disclaims liability for any incidental,
consequential, or other damages, including but not
limited to, loss of profits or damages to a structure or
its contents arising under any theory of law
whatsoever.
Availability & Price
EMSEAL products are available throughout the United
States and Canada. Prices are available from local
representatives or direct from the manufacturer. The
EMSEAL product range is continually being updated.
Accordingly, we reserve the right to modify or withdraw
any product without prior notice.
INSTALLATION--GENERAL:
There are basically three blindside installation conditions
that will be described in this guide.
and permanently to the BG SYSTEM material of
manufacture.
2) The waterproofing membrane shall be installed
continuously across the mud-slab and/or
lagging walls.
3) A continuous strip of waterproofing membrane
will be centered over the position of the
expansion joint on the wall and/or floor slab;
4) The BG SYSTEM double-level side sheets shall
be installed without any folds, “fish-mouths”
or wrinkles, into a wet waterproofing
membrane mastic suitable to adhereing the BG
SYSTEM double-level side sheets to the
waterproofing membrane. The waterproofing
membrane mastic is to be applied to a width
wider than the longer of the BG SYSTEM double-
level flashing sheets by at least 2” (50 mm).
The waterproofing membrane mastic is to be
applied both below the longer of the BG
SYSTEM double-level flashing sheets as well as
above the longer of the BG SYSTEM double-
level flashing sheets so as to completely
encapsulate the BG SYSTEM double-level
flashing sheets.
5) All BG SYSTEM double-level flashing sheet
transitions from floor to wall must be fully
encapsulated (above and below) in
waterproofing membrane mastic.
6) The longer of the BG SYSTEM double-level
flashing sheets and wet waterproofing
membrane mastic shall be covered by another
full-width strip of waterproofing membrane on
each side of the belly under the shorter of the
BG System double-level flashing sheet.
7) The entire BG SYSTEM/waterproofing membrane
sandwich shall be clamped into place using
EMSEAL supplied termination bar and
protruding-head anchors through the shorter
of the double-level flashing sheet.
8) BG SYSTEM/waterproofing membrane sandwich
shall have concrete cast directly against it.
9) The BG SYSTEM shall transition into the MIGUTAN
plaza deck joint system on the roof slab or shall
be suitably transitioned into the above-grade
wall joint system in the building face.
10) The ultimate objective is to ensure continuity
of seal around the complete structure as
shown below:
In this typical tunnel applica-
tion, BG is used under the slab
and up the blind-side formed
walls. At the transition above
the blind-side walls, BG wraps
over the roof in softscapes or
joins to MIGUTAN on the
freestanding walls and across
the roof or plaza deck in
hardscape wear courses.
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 3 OF 8
www.emseal.com
EQUIPMENT LISTEQUIPMENT LIST
EQUIPMENT LISTEQUIPMENT LIST
EQUIPMENT LIST
(In addition to normal tools of the trade and safety
equipment, as well as tools and materials required by
the manufacturer of the waterproofing membrane, the
following materials and equipment must be on-site
before installation can begin):
For Preparing and Drilling Mud-Slab Concrete
4-inch angle grinder(s) with diamond cup blade(s)
minimum 2 ea - Hammer drills with depth guides
minimum 6 ea - Hammer drill bits, 3/16-inch (5 mm)
diameter, suitable for masonry/concrete
Generator, fuel, and accessories or access to reliable
high-amperage power source
For Cutting Termination Bar
hacksaw
IMPORTANT: The BG SYSTEM installtion explained in
this sheet is not for use on freestanding walls where
access to the wall is available. Where access to the
positive side of the wall is available BG is installed in
accordance to positive-side installation instructions.
Unroll the sealing gland belly-side up in a clean open space
to allow the rubber to relax from its coiled shipping state.
Prepare concrete surfaces as required by the
waterproofing membrane manufacturer.
For Driving Screws
Electric drill/driver. (minimum 14.4 volt cordless works
well)
minimum 6 ea - #3 screw-gun bits
Other Miscellaneous Tools and Materials
100-foot (30 meter) tape measure (or length to suit
project)
chalk box with chalk
Flat bar and small pry bar
5-gal pail of Acetone* for cleaning joint-faces, trowels
and mixer tools
box of clean, dry, lint-free, cloth (not paper) rags
extension cords with 4-way box
Note: If drainage board is specified to be installed against
the lagging or shot-crete wall, install it first in accordance
with the instructions of the waterproofing manufacturer
and/or drainage board manufacturer as applicable.
IMPORTANT: Using drainage board as a means to
creating a smooth substrate is NOT ACCEPTABLE. The
surfaces that will support the drainage board must be
smooth, lagged walls.
INSTALLATION:
STEP 1: Unroll Sealing Gland and Prepare Floor and Wall Surfaces
One side of lagging-graphic
removed for clarity
Lagging
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 4 OF 8
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
www.emseal.com
Install waterproofing membrane over entire mud slab
with an appropriate upturn onto wall surfaces in
accordance with waterproofing membrane
manufacturer’s procedure.
Apply waterproofing membrane adhesive mastic onto
the waterproofing membrane on the floor and wall-
upturn on each side of joint-gap location.
Clean the underside of the BG SYSTEM side sheets using
solvent and
clean lint-free, 100% cotton rags
Note: Hang BG SYSTEM for walls freely for later
integration with the waterproofing membrane to be
installed on the walls.
Install the BG SYSTEM so that the belly of the gland is
centered over the joint-gap location.
Press or roll the BG SYSTEM flashing sheets firmly into
the wet waterproofing membrane adhesive mastic being
sure that outside corner of the upturn is also firmly
embedded in the waterproofing membrane adhesive
mastic.
Note: 90
o
transitions to the vertical are shipped as
factory-welded upturns manufactured to field-measured
dimensions by contractor. Ensure that these upturns
have been ordered and delivered and are on site before
starting installation.
STEP 2: Install Waterproofing Mem-
brane on Mud-Slab and Wall
Upturn
STEP 3: Apply Waterproofing
Membrane Adhesive Mastic
STEP 4: Clean Underside of BG and Install BG into Wet Waterproofing
Membrane Mastic
BG SYSTEM with 90-deg.
factory-welded upturn
manufactured to field-
measured dimensions from
contractor
BG SYSTEM hangs freely for
later integration with wall
waterproofing
On floor-slab waterproofing
and on wall-upturn
waterproofing BG SYSTEM is
embedded into wet
waterproofing gel mastic
Waterproofing mastic applied
minimum 16” wide on each
side of joint-gap location
Below-foundation-floor
waterproofing laid over
entire mud slab with upturn
onto wall surfaces
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 5 OF 8
www.emseal.com
Clean the exposed longer side of the BG SYSTEM
double-level side sheets with acetone and clean,
lint-free rags.
Apply waterproofing membrane mastic over the exposed
longer but under the shorter of the 2 sides of BG
double-level side sheets to fully encapsulate them.
Note: Mastic applied minimum 16” wide on each side of
belly of sealing gland to fully encapsulate side sheets
Roll out full-width sheet of waterproofing membrane into
wet waterproofing membrane mastic on top of BG
SYSTEM side sheets.
Install termination bars on both sides of the belly of the
BG-gland with BG-Anchors spaced 2.75-inches (70 mm)
from edge of belly of BG-gland.
Screw anchor bolts through pre-drilled holes in
termination bar.
Note: When anchoring to concrete, predrill concrete
using 3/16-inch (5 mm) diameter, concrete drill bit to
receive anchors.
Note: If transitioning from underslab to freestanding
walls (to be cast later), leave a free length of BG for
welding to the BG positive-side sheets or MIGUTAN
FP110/25 gland and side sheets on freestanding wall.
STEP 5: Apply Mastic Over Top of the
Longer BG Side Sheets
STEP 6: Apply Full-Width Sheet of Wa-
terproofing Membrane Over
Mastic and BG
STEP 7: Install Termination Bar and
Anchors
STEP 8: If Applicable: Field-weld BG to
Positive-side BG or MIGUTAN
FP110/25 on Freestanding
Walls
Full-width sheet of
waterproofing membrane
embedded into waterproofing
mastic over BG SYSTEM side
sheets
Waterproofing mastic applied
over BG SYSTEM side sheets
Mastic applied minimum 16
wide on each side of belly of
sealing gland to fully
encapsulate side sheets
Waterproofing
membrane overlay
on top of BG
SYSTEM side sheet
BG SYSTEM anchors
with protruding
shaft
Termination bar
Belly of BG SYSTEM
gland
Termination bars and
BG-Anchors installed
2.75” from edge of
belly of BG-gland.
Anchors spaced 6
on center.
Note: When
anchoring to concrete
mud-slab, pre-drill
concrete to receive
anchors.
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 6 OF 8
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
www.emseal.com
Install waterproofing
membrane on walls to cover
the entire wall surface. Install in
accordance with waterproofing membrane
manufacturer’s procedures and instructions.
Note: Ensure that a full-width sheet of waterproofing membrane is
installed centered over the centerline of the expansion joint
location. If a seam between previously installed waterproofing
membrane is within 2-feet of the expansion joint centerline, then
install another full sheet of waterproofing membrane centered over
the expansion joint centerline.
Apply waterproofing membrane adhesive mastic to the
waterproofing membrane beneath the longer of the BG
double-level side sheets on wall. Width of waterproofing
membrane adhesive mastic to be such that it extends a
minimum of 2-inches (50 mm) beyond the edge of the
longer flashing sheet (approximately 16-inches (410 mm)
total) each side of joint-gap location.
Firmly embed longer of the BG SYSTEM’s double-level side
sheets into wet waterproofing membrane mastic by
pressing or rolling.
Clean the exposed upper side of the BG SYSTEM side sheets
with solvent and clean, lint-free rags to remove all dirt,
debris and other contaminants.
Apply another coating of waterproofing membrane adhesive
mastic over the top of the longer of the BG SYSTEM’s
double-level side sheets to ensure full encapsulation.
Apply a full-
width sheet of
waterproofing
membrane into wet
waterproofing membrane
mastic on top of BG SYSTEM side sheets.
Install termination-bar and BG SYSTEM anchors to lagging.
Note: In lagging, screws can be driven without predrilling.
To cast the joint-gap, suspend forms over belly of BG
SYSTEM.
(Alternatively, set
casting-bulkheads on either
side of belly of BG SYSTEM.
Either way, ensure that the belly
is not crushed and the BG SYSTEM/waterproofing
membrane sandwich is not damaged).
STEP 9: Install Waterproofing Mem-
brane on Walls & Apply Mastic
Beneath BG Side Sheets
STEP 10: Apply Mastic Over Exposed
Surface of BG Side Sheets on
Walls
STEP 11: Apply Waterproofing Mem-
brane over Mastic and BG
and Install Termination Bar
and BG-Anchors
STEP 12: Set Forms or Bulkheads to
Cast Joint-Gaps
IMPORTANT: Steps 12 through 16 are usually the
responsibility of the General Contractor or Concrete Sub-
Contractor and may be job specific and may vary.
Coordination with the waterproofing subcontractor for
completion of the BG SYSTEM installation,as well as the
actions of GC in protecting the in-
place system components, during
these steps is critical.
Another coating of
waterproofing
mastic covers BG
SYSTEM side sheets
to ensure full
encapsulation.
To cast the joint-gap.
forms are placed over
belly of BG SYSTEM
(Alternatively,
casting-bulkheads are
set on either side of
belly of BG SYSTEM)
Full-width sheet of
waterproofing
membrane
embedded into
waterproofing
membrane mastic
over BG SYSTEM side
sheets.
Termination-bar and
BG SYSTEM anchors
secure system to
lagging.
Waterproofing
mastic applied to
waterproofing
membrane beneath
BG SYSTEM side
sheets. Width of
mastic is minimum
16” on each side of
joint-gap location.
BG SYSTEM side
sheets embedded
into wet
waterproofing
mastic.
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 7 OF 8
www.emseal.com
STEP 13: Set Rebar Adjacent to
Forms as Required
STEP 14: Place Concrete for Floor
Slabs
STEP 15: Place Concrete for Wall
Slabs
STEP 16: Align Roof Joint-Gap Forms
and Place Concrete for
Roof Slabs
Rebar placed
adjacent to joint gap
location (shown one
side only).
Concrete floor cast on
top of waterproofing
membrane and BG
SYSTEM sandwich.
Concrete walls cast
against waterproofing
membrane and BG
SYSTEM sandwich on
walls.
Form for roof-slab
expansion joint is set
to ensure alignment
with wall joint-gaps.
Roof slabs are cast
against form.
Place rebar adjacent to joint gap location as required.
IMPORTANT: Rebar installation and concrete placing
schedules vary from project to project. The principles of
installation and protection of the BG SYSTEM and
waterproofing membrane system must be understood and
respected by all trades regardless of schedule.
Cast concrete walls against waterproofing membrane
and BG SYSTEM sandwich on walls.
Set form for roof-slab expansion joint to ensure
alignment with wall joint-gaps.
Cast concrete floor on top of waterproofing membrane
and BG SYSTEM sandwich.
BG SYSTEM--PRODUCT/INSTALL DATA
JULY 2023, 8 OF 8
EMSEAL JOINT SYSTEMS, LTD. 25 Bridle Lane, Westborough, MA 01581 USA PH: 508.836.0280 FX: 508.836.0281
EMSEAL LLC, 111 Royal Group Crescent, Woodbridge, ON L4H 1X9 Canada PH: 416.740.2090 FX: 416.740.0233
Copyright © 2023, by EMSEAL Joint Systems Ltd, All Rights Reserved
www.emseal.com
STEP 17: Remove Joint-Gap Forms STEP 18: Weld BG into MIGUTAN on
Roof
Foundation Slab
Walls
Footings
If there is no joint in the foundation slab,
wall and foundation waterproofing wraps
the entire structure.
BG SYSTEM installed into wall joints and
encapsulated into waterproofing sandwich
must extend beyond floor slab
elevation and well into drainage
course.
Note:
Forms removed to
allow free expansion
and contraction of
slabs at joints.
Remove forms from joint-gaps to allow free expansion
and contraction of slabs at joints.
Field-weld the factory-fabricated outside-corner transition
between BG SYSTEM and MIGUTAN plaza deck joint
system.
Install the MIGUTAN plaza deck joint system in
accordance with complete MIGUTAN installation
instructions available from EMSEAL.
IMPORTANT: If there is no joint in the foundation floor slab, AND wall and foundation waterproofing wraps the
entire structure, AND the BG SYSTEM is being installed against the blind side walls only
, then the BG SYSTEM
installed into wall joints and encapsulated into waterproofing sandwich must extend beyond the finished (interior)
floor slab elevation and well into drainage course. If this is not done, any water collected by the BG SYSTEM could
be funneled into the structure at the wall to floor-slab connection.