Work Away from the Fixed Location
There are times when it may become necessary to perform work at locations away from the
repair station. This may be done on a temporary basis (short term or extended) under special
circumstance. Work will not be performed outside of the United States of America (U.S.A.)
unless it is authorized by the FAA as a special circumstance. If work is to be performed outside
of the U.S.A., the repair station will obtain approval from the country where the work is to be
accomplished before requesting authorization from the FAA.
Work will not be performed away from the repair station on a recurring basis. Recurring work is
considered to be things like engine on wing repairs, nondestructive testing, and fuel cell repairs
that are performed as part of everyday business practices. This type of work requires issuance of
Operations Specifications paragraph D100, which has not been issued to this repair station.
Work may be performed away from the repair station as a special circumstance when there is a
situation that makes it difficult to accomplish the work at the fixed location. An example of this
might be an aircraft on the ground at a remote location with a blown tire, failed generator, radio
or navigation equipment problems, etc. This will be done only on a short term temporary basis.
All work will be accomplished in the same function and manner as at the repair station using the
same performance standards and recordkeeping. Before work is initiated, a site evaluation will
be conducted to ensure that all necessary personnel, equipment, material, and data are available.
In cases where the work will take more than a day to complete, notification will be made to the
CHDO by the Accountable Manager or Chief Inspector in writing (either paper or electronic)
before the work is initiated. This notification will identify the work start date, a description of
the work to be performed or anticipated, the location at which the work is to be performed,
estimated time to accomplish, and the personnel who will be doing the work.
If work is expected to take more than a month to accomplish, or if that extended amount of time
is needed relative to a previous request, the Accountable Manager or Chief Inspector will
provide the CHDO with a plan on how the project will be performed. This plan will ensure that
the materials, equipment, and personnel are adequate to perform the work and will include:
• Controlling of parts, equipment, tools, and required forms, etc.;
• Identification of qualified personnel and inspectors for the work required;
• Verification that the scope of the work is within the repair station ratings;
• Evaluation of the housing an facilities available;
• Length of time the project is expected to take; and
This plan must be approved by the CHDO in writing and may include terms or conditions that
must be met. This document becomes part of the work order and is retained with those records.
Any work performed for an air carrier under this special circumstance will be accomplished in
accordance with the air carrier’s programs, or programs and procedures acceptable to them. The
air carrier will be informed of all work that is contracted out and will have the right to inspect all
work performed by the repair station or its’ contractors.
All work performed away from the fixed location will be accomplished to the same standards as
the repair station. Before work is initiated, a site evaluation will be conducted to ensure that all
necessary personnel, equipment, material, and technical data are available. The Chief Inspector
is responsible for ensuring that these steps are followed.